Installation
ComponentsElectrical Key Oscillator(for Front Floor)
Components
COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 1 INDOOR ELECTRICAL KEY ANTENNA ASSEMBLY
(a) Engage the clamp to install the No. 1 indoor electrical key antenna assembly.
(b) Connect the connector.
2. INSTALL FRONT CONSOLE BOX
(See page )
Remov ...
Front Evaporator Temperature Sensor
Inspection
INSPECTION
PROCEDURE
1. INSPECT COOLER THERMISTOR SENSOR
(a) Check the resistance.
(1) Measure the resistance and check the results in accordance with the
values in the table below.
Standard:
Tester Connection
Condition
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...