Replacement
REPLACEMENT
PROCEDURE
1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM
(a) Start up the engine.
(b) Turn the A/C switch to ON.
(c) Operate the cooler compressor with an engine speed of approximately 1,000
rpm for 5 to 6 minutes to circulate the refrigerant and collect the compressor oil
rem ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT BRAKE VACUUM CHECK VALVE ASSEMBLY
(a) Check that there is ventilation from the booster to the engine, and
no ventilation from the engine to the booster.
If the results are not as specified, replace the vacuum check valve.
...
Components
COMPONENTS
ILLUSTRATION
*1
LOWER NO. 2 STEERING WHEEL COVER
*2
LOWER NO. 3 STEERING WHEEL COVER
*3
STEERING PAD
-
-
N*m (kgf*cm, ft.*lbf): Specified torque
-
...