ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH
(a) Apply the parking brake.
(b) Turn the ignition switch to ON.
(c) Depress the brake pedal and move the shift lever to any position other than P.
(d) Depress the brake pedal and check that the engine starts when the shift lever is in N or P, but does not start in other positions.
(e) Check that the back-up light comes on and the reverse warning buzzer sounds when the shift lever is in R, but the light and buzzer do not operate in other positions.
If a failure is found, check the park/neutral position switch for continuity.
Pump Motor Relay (C1253)
DESCRIPTION
The motor relay (semiconductor relay) is built into the master cylinder solenoid
and drives the pump motor based on a signal from the skid control ECU (master cylinder
solenoid).
DTC No.
DTC Detecting Condition
Trouble Areas
C1253
...
Rear Cross Traffic Alert Buzzer
Components
COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR CROSS TRAFFIC ALERT BUZZER
(a) Engage the clamp to install the rear cross traffic alert buzzer.
(b) Connect the connector.
2. INSTALL QUARTER INSIDE TRIM BOARD LH (for Double Cab)
(See page )
3. ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
(a) Engage the 5 guides to install the instrument panel sub-assembly.
(b) Engage the clamps and connect the connectors.
(c) Install the nut <G>.
(d) Install the 8 bolts <A>.
(e) Install the 2 bolts <B> or 2 bo ...