PRECAUTION
1. Check that the battery cables are connected to the correct terminals.
2. Disconnect the battery cables when the battery is given a quick charge.
3. Do not perform tests with a high voltage insulation resistance tester.
4. Never disconnect the battery while the engine is running.
5. Check that the charging cable nut is tightened on terminal B of the generator and the engine room relay block.
6. IGNITION SWITCH EXPRESSIONS
HINT:
The type of ignition switch used on this model differs depending on the specifications of the vehicle. The expressions listed in the table below are used in this section.
Expression |
Ignition Switch (Position) |
Engine Switch (Condition) |
---|---|---|
Ignition Switch off |
Lock |
Off |
Ignition Switch ACC |
ACC |
On (ACC) |
Ignition Switch ON |
ON |
On (IG) |
Engine Start |
START |
Start |
Short in Side Squib LH Circuit (B1825/56-B1828/56)
DESCRIPTION
The side squib LH circuit consists of the airbag sensor assembly and the front
seat airbag assembly LH.
This circuit signals the SRS to deploy when airbag deployment conditions are
met.
These DTCs are set when a malfunction is detected in the side squib LH circuit.
DTC ...
Definition Of Terms
DEFINITION OF TERMS
Term
Definition
Monitor description
Description of what the ECM monitors and how it detects malfunctions
(monitoring purpose and details).
Related DTCs
Group of diagnostic trouble codes that are ou ...
Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for both the LH and RH sides.
The procedure described below is for the LH side.
PROCEDURE
1. INSTALL HEADLIGHT ASSEMBLY
(a) Connect the connectors.
(b) Engage the clamp to install the headlight assembly.
(c) ...