Front Upper Suspension Arm
AdjustmentInspection
INSPECTION
PROCEDURE
1. INSPECT FRONT SEAT CUSHION HEATER ASSEMBLY
(a) Check the operation of the front seat cushion heater assembly.
(1) Apply battery voltage and check the operation of the front seat cushion
heater assembly.
OK:
Connection
...
System Voltage Circuit Short to Ground or Open (P056014)
DESCRIPTION
The battery supplies power to the ECM even when the ignition switch is off. This
power allows the ECM to store data such as DTC history, freeze frame data and fuel
trim values. If the battery voltage falls below a minimum level, the ECM data is
cleared and the ECM determines that ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL AUTO HIGH BEAM SWITCH
(a) Attach the 2 claws to install the auto high beam switch to the instrument
panel lower finish panel sub-assembly.
2. INSTALL INSTRUMENT PANEL LOWER FINISH PANEL SUB-ASSEMBLY
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBL ...